Projects

 

 

 

 

 

                                                                       

                                                      

                                                        

CY Middle School

 

CY Middle School Front Entry

Project:             New construction of a state of the art middle school.

Owner:                  Natrona County School District #1

Location:            Casper, Wyoming

Project Size:      118,000 sf

  • Variable air volume air handlers with air side economizers
  • Air-to-air heat exchangers with variable aire volume terminal reheat
  • Large size zones utilize displacement ventilation increase comfort and indoor air quality at reduced heating and cooling loads.
  • Modular boiler plant design utilizing four high efficiency condensing type, sealed combustion boilers: primary/secondary variable speed pumping distributes the heating water.
  • Cooling plant includes two packaged outdoor air cooled chillers and primary/secondary variable speed distribution.
  • Building automation system is a BacNet system of interoperable direct digital controls.
  • Electrical systems designed were: power distribution, classroom lighting with daylight harvesting, general lighting, fire alarm, CCTV, door access control, CATV, security, telecom and intercom systems.