Projects

 

 

Project:                New construction of a six unit 3rd through 5th grade school

Owner:                  Johnson County School District #1

Location:         Buffalo, Wyoming

Project Size:    57,000 sf

  • Indoor central station variable volume air handlers
  • Air-to-air heat recovery
  • Carbon dioxide sensors are utilized to determine outside air volumes for demand ventilation.
  • Zoning is achieved at the room level with variable air volume boxes and hot water reheat coils.
  • Heating system includes a modular boiler plant design utilizing multiple high efficiency boilers.
  • Redundant system pumps and primary/secondary distribution are employed
  • Chilled water plant includes a roof mounted packaged outdoor air cooled chiller and single system pump.
  • Building automation is accomplished with a LON system of interoperable direct digital controls.
  • Electrical design includes high efficiency lighting with occupancy and daylight controls, fire alarm, door access, video surveillance, classroom multi-media, and intercom systems

    

 

 

 

 

 

                                                           

 

                                                                            

Cloud Peak Elementary School