Project:                New construction of K through 5 elementary school

Owner:                  Natrona County School District #1

Location:         Casper, Wyoming

Project Size:    53,200 sf

  • The mechanical systems included indoor central station variable air volume air handlers with air side economizers.  Zoning was achieved with variable air volume terminal reheat.

  • The heating system includes a modular high efficiency condensing boiler plant design.

    Redundant variable speed system pumps, along with variable capacity scroll compressors for the chilled water system. Building automation is a BACnet system of interoperable direct digital controls.

  • The electrical systems are classroom and general area lighting design, power distribution, fire alarm, intercom, CCTV, and connections to mechanical and owner provided equipment.

     

 

 

 

 

 

 

                                                           

 

                                                                            